Malaysia — Palm Oil
Palm Oil Processing Plant Upgrade
Challenge: Existing boiler had low efficiency and high fuel costs using diesel.
Solution: Custom biomass boiler designed to use palm shell as fuel — a waste product they already had in abundance.
Equipment: 2-ton biomass steam boiler with automated feeding system
Timeline: From inquiry to operation: 45 days
Results: 40% reduction in fuel costs, 25% increase in production capacity, payback period under 14 months
Thailand — Hospitality
Resort Hot Water System
Challenge: Unstable hot water supply causing guest complaints at a 120-room resort in Phuket.
Solution: Modular hot water boiler system with smart temperature control and backup units.
Equipment: 0.5-ton oil-fired hot water boiler × 2 units (1 active + 1 backup)
Timeline: Installed and operational in 30 days
Results: 24/7 stable hot water supply, 30% reduction in energy costs, zero guest complaints since installation
Indonesia — Food Processing
Rubber Factory Steam Supply
Challenge: Old coal boiler failing environmental inspections, facing potential shutdown.
Solution: Multi-fuel biomass boiler that can run on rice husk or wood chips — whichever is cheaper locally.
Equipment: 4-ton multi-fuel steam boiler with automatic ash removal
Timeline: Custom build and shipping: 60 days
Results: Passed environmental inspection, 35% lower operating cost vs. previous coal system, reduced emissions by 60%
Vietnam — Textile
Textile Dyeing Plant Expansion
Challenge: Expanding production needed additional steam capacity but had limited floor space.
Solution: Compact vertical electric steam boiler requiring minimal footprint.
Equipment: 500kg/h electric steam boiler with integrated control panel
Timeline: Delivered and running in 21 days
Results: Production capacity increased by 40%, zero emissions, perfect temperature stability for dyeing quality